These photos are from October. We've made major progress!
Exterior Paint - All that's left to do on the exterior is lights and garage doors.
 |
Exterior Paint! |
The gravel driveway is in.
 |
Driveway |
Our original design of the cabin would fit the tent trailer inside the garage - fully deployed. The idea was that we could use it during construction (which wasn't such a great idea as it's a really noisy place to hang out, and in the summer it was better to camp outside), and that it could be used as overflow sleeping space when we're done building. I don't know if we'll ever use it that way. But, since that was one of our design criteria, we didn't want to lose the potential. However, the utility room, with the crazy hydronic floor heating system, ended up growing, and growing, until we realized that we would no longer be able to deploy the tent trailer. So we decided to add a hole to the utility room wall that we can poke the tent trailer into. We'll build a door to close the utility room up otherwise. Justin thought it looked like a restaurant/bar with a still behind the counter, so he hung a nice menu up over the opening.
Electrical wiring, security and data wiring, plumbing, and insulation are done!!!!!
 |
Belly up! |
 |
Living Room |
 |
Kitchen |
 |
Kitchen |
 |
Hallway/Loft |
 |
Hallway/Loft |
 |
Sylvie's "Nook" |
No comments:
Post a Comment